Construction time overrun as a function of risk factors

Vahida Žujo, Diana Car-Pušić

Abstract

The analysis of overrun of contract-based construction times, as triggered by risk factors, is presented in the paper. The principal objective is to determine a model, as realistic as possible, for rapid estimation of construction time. Based on data from the total of 53 building construction projects realized in the Federation of Bosnia & Herzegovina, appropriate models were established for two building types, i.e. new construction and rehabilitation of existing facilities. These models can be applied in situations where the occurrence and activation of risk factors can realistically be expected.

Keywords
construction model, new structure, rehabilitation, risk factors, construction time estimation, construction time

HOW TO CITE THIS ARTICLE:

Žujo, V., Car-Pušić, D.: Construction time overrun as a function of risk factors, GRAĐEVINAR, 61 (2009) 8

OR:

Žujo, V., Car-Pušić, D. (2009). Construction time overrun as a function of risk factors, GRAĐEVINAR, 61 (8)
Authors:

Vahida Žujo
University of Mostar
Faculty of Civil Engineering "Džemal Bijedić"
Diana Car Pusic WEB
Diana Car-Pušić
University of Rijeka,
Faculty of Civil Engineering